Strike Project

Hiding in the Open

Numerous uranium showings at surface identified 
between 1950’s and 1980’s

Three uranium mineralized conductor trends to start
with 12+km of strike and additional conductors requiring evaluation

Leverage to past work by Cameco provides fast-track to high-priority drill targets

First drilling of EM conductors by Fortune Bay Corp
intersected anomalous uranium in 3 of 9 holes

Unconformity-Style mineralization confirmed at the Tena Zone
with 1,000 tons mined in the 1950’s at
reported grades of 0.6 to 3.5% U₃O₈

Concept Confirmed

Initial 1,000 m planned in 5 holes
to start with an average depth of 200 m

14 targets identified to start including 11 new targets
and 3 follow ups ready for drilling with more expected

New basement-style uranium mineralization discovered in 3 of 9 holes and exploration model validated

Shallow intersections between 60 and 105 m below surface

The right rocks with graphitic units and alteration intersected in all 9 holes

Technical Report

Technical Report 43-101

Effective Date: Febuary 7, 2024

Option Terms

Strike & Murmac Projects

Strike Project News

Aero Energy Reports on Recent Exploration Insights at the Strike Project, Athabasca Basin, Saskatchewan

Aero Energy Partners with Leading Drill Contractor for Upcoming Exploration on its Athabasca Basin High-Grade Uranium Projects 

Aero Energy Announces Airborne VTEM™ Plus Survey Targeting High-Grade Uranium Mineralization on the Athabasca Basin’s Northern Rim

Explore Aero Energy

North Basin Projects

Learn about Aero Energy's North Basin Projects with deep roots in Saskatchewan's first uranium district

Team

Meet the Management and Advisory team behind Aero Energy

Investors

Learn more about the investment opportunity at Aero Energy

Contact

Get in touch with the team at Aero Energy